J.D.Pools designs, builds and fits out swimming pools for homes, pool villas, hotels, resorts, condominiums and competition venues across Thailand. One team handles the whole job: the site survey, the design, the pool structure, the filtration and other systems, the handover and the after-sales care. The work is done by the branch in your area, and our fiberglass pools come from our own ISO 9001:2015 factory in Phuket.
One contractor from the first site visit to the first swim, so you are not coordinating a builder, a plumber and an electrician yourself.
The local branch checks the space, the soil, the groundwater level, the slope and truck access. Those decide which structure suits the plot and how it is built.
Shape, size, depth, edge, steps, spa seating and the position of the plant room, fitted to the plot and to how you will use the pool. We work with your architect if you have one.
Excavation, piling where the soil needs it, the base and the pool itself: a one-piece fiberglass shell, an iPanel wall system or reinforced concrete.
Filter, pump, pipework, fittings, electrics and underwater lights, sized to the water volume, with the plant room laid out for easy servicing.
Salt chlorination, heat pumps, pool covers and counter-current swim jets, installed with the build or prepared for later with the pipes and power in place.
We test the systems, fill the pool, balance the water and show you how to run and look after it before handover, with the J.D.Pools warranty documents.
The structure depends on your plot, your timeline and the shape you want. The branch compares the options with you on the survey.
Factory-made shells, installed and ready to swim in about 7 days, with a 15-year structural warranty. Shapes and sizes follow the model range, such as Composite Pool, Cardio Pool and Family Pool.
Prefabricated wall panels assembled on site, so any shape and size works, from a garden pool to an Olympic-size 50 × 25 m pool. 10-year structural warranty on the iPanel structure. Models include iP Smart Pool and iP Da Vinci Pool.
For designs that need a bespoke structure, such as infinity edges, see-through glass walls or large freeform pools. These take about 30 to 60 days or more.
Send the size you have in mind, the location and photos of the site through the quote form.
Our sales team calls back, talks through use and budget, and books a free site survey with your local branch.
You receive a design and a quotation, and we adjust the shape, size or systems until they are right.
The branch team builds the pool and installs the systems to the agreed design.
We test, hand over and show you the care routine. The same branch looks after the pool from then on.
For what happens in each phase, from permits to the first fill, read our 8-step guide to pool construction.
Your own timeline is confirmed after the survey: it depends on size, design, soil and site access.
| Pool type | Typical build time | Structural warranty |
|---|---|---|
| One-piece fiberglass (composite) | About 7 days | 15 years |
| iPanel wall pool with liner | Confirmed after the survey | 10 years (iPanel structure) |
| Concrete and custom pools | About 30–60 days or more | As set out in the quotation |
Warranties follow J.D.Pools’ warranty terms and conditions. In the rainy season, excavation and concrete work can move with the weather.
The branch that built your pool handles after-sales: system checks, repairs and replacement equipment. You call the branch directly.
A leaking or worn pool can be renovated with a new liner over the existing shell instead of breaking it out, and old filtration can be upgraded.
Spare parts and equipment can be bought online from PoolBestBuy, and Pool Pro&Lab’s guides explain water care step by step (links below).
Each branch has its own survey, construction and service team. Open a branch page for its projects, the area it covers and its phone number.
A few of the pools J.D.Pools branches have built for homes, condominiums, hotels and competition use. Details from each project’s portfolio page.
Olympic-size, 50 × 25 m · iPanel structure with liner · built by the J.D.Pools factory team
The Bell Condominium, Phuket · freeform, 15 × 8 m, 1.20 m deep · Phuket branch
Solis Beach Hotel · see-through glass wall, 9 × 4 m · Hat Yai branch
J Condo Rama 2, Bangkok · one-piece fiberglass pool, 7.33 × 3.78 m · Bangkok branch
Pool villa, Khon Kaen · freeform with a kids’ zone, 12 × 4 m, salt system · Khon Kaen branch
Private house, Rayong · one-piece fiberglass pool, 9.95 × 4.40 m · Rayong branch
Nationwide, through 22 branches. The local branch surveys, builds and services the pool. Where there is no branch, the nearest one covers the area: Pattaya and the Chonburi coast, for example, are served by the Rayong branch.
A free site survey, the pool design, construction of the pool, the filter, pump, pipework and electrics, any options you choose, testing and handover, then after-sales care from the same branch.
A one-piece fiberglass pool can be installed and ready to use in about 7 days. A concrete or custom-designed pool takes around 30 to 60 days or more. Your timeline is confirmed after the site survey.
Composite (one-piece fiberglass) pools have a 15-year structural warranty, and iPanel wall pools a 10-year warranty on the iPanel structure, under J.D.Pools’ warranty terms and conditions.
Yes. Examples include the 15 × 8 m pool at The Bell Condominium in Phuket, the glass-walled pool at Solis Beach Hotel and an Olympic-size 50 × 25 m pool. Our hotel and resort page shows more.
Yes. Branch teams fit filtration and other systems, and renovate older pools, for example with a new liner over the existing shell instead of demolishing it. The work is assessed on a site survey.
Yes. Our call centre answers in Thai and English, and you can send your enquiry in English through the quote form. The branch team then arranges the site survey with you.
It depends on size and depth, the structure, the soil and any piling, site access, the edge design and the systems you choose. The branch assesses it on the free site survey and sends a quotation.
Last updated 25 November 2026